Hornchurch sports Centre – Case Study

Hornchurch Sports Centre

Hornchurch sports Centre

As approved contractor for leisure with Havering Council we managed to temporary weld boiler casings and install containerised plant in the leisure centre car park whilst we replaced all the heat generating equipment for the sports hall and 33m pool without shutting the facility.

We replaced the antiquated system with a fully modular and cascading condensing system with plate heat exchangers for pool water and domestic hot water generation which is extremely efficient.

Send us mail

1 + 4 = ?