Case Study – Fitness First

FITNESS FIRST HEALTH CLUB HAMMERSMITH

Design Consultants for a proposed introduction of a basement pool as part of the refurbishment project

Design, Consultancy & Construction of Basement Pool

Contracted by Fitness First Leisure

Aquascapes were initially appointed by Fitness First Health Clubs, as Design Consultants for a proposed introduction of a basement pool as part of the refurbishment project at their Hammersmith facility.

This contract was upgraded to include the construction of the Pool and Plant.

The space was challenging, given the columns coming through the centre of the pool, but with clever design and engineering we managed to turn them into a key feature of this pool.